How It Works: Time Recorder Production Process

 

Our time recorders undergo a rigorous 6-stage manufacturing process to deliver industry-leading reliability and precision for global businesses.

 

1. Clock-in Test

Functional verification of core attendance operations: card recognition, timestamp accuracy, data logging, and print/display output. Ensures seamless end-user operation from day one.

 

2. Electric Test

Comprehensive electrical validation includes:

Power supply stability & safety compliance

Interface communication (USB/RS232/network)

Key response & tactile feedback

RTC (Real-Time Clock) precision calibration

Insulation & ESD protection testing

 

3. Machine Vibration Aging Test

Simulates transportation vibration and long-term usage stress to:

Test structural integrity of casing and internal components

Verify solder joint reliability under mechanical stress

Eliminate latent defects before shipment

 

4. Burn-in Testing

Continuous 48–72 hour operation under controlled temperature/humidity to:

Accelerate component aging and screen early failures

Validate stable performance under prolonged use

Ensure compliance with 24/7 operation requirements

 

5. Quality Control (QC)

Final multi-point inspection:

Visual check for cosmetic defects & labeling accuracy

Re-test of all core functions (clock-in, print, communication)

Calibration verification for time accuracy

Barcode labeling for full production traceability

 

6. Packing & Warehousing

Finished units are prepared for global delivery:

Protective anti-static wrapping & foam cushioning

Inclusion of user manual, power adapter, and mounting accessories

Barcode scanning for inventory & shipment tracking

Secure palletization for ocean/air freight

 


Production Line Overview

 

6 Parallel Assembly Lines: High-volume production capacity to meet global demand

In-line QC Stations: Real-time defect detection at critical process steps

ISO 9001 Compliant: Full process traceability and quality documentation

 

 

burn-in testing_

Burn-in testing

Clock- in test(001)

Clock- in test

Electric test(001)

Electric test

 

Machine vibration aging test(001)

Machine vibration aging test

packing(001)

Packing

production line 1(001)

Production line 1

 

production line 2(001)

Production line 2

production line 3(001)

Production line 3

production line 4(001)

Production line 4

 

production line 5(001)

Production line 5

production line 6(001)

Production line 6

quality control(001)

Quality control